LANDESBETRIEB FR HOCHWASSERSCHUTZ UND WASSERWIRTSCHAFT SACHSENANHALT
A United Kingdom buyer, with 12 published contracts, worth £2.9m, most recently 5 months ago.
Top 5 suppliers won 99% of awarded value — £2.8m of £2.9m across 12 awards.
This contract involves the provision of ecological construction supervision services for waterway construction, renovation, and sewer rehabilitation. Suppliers will be responsible for consulting on the integration of nature and environmental protection considerations into construction execution. Key
This contract involves landscaping work as part of the renovation of the right Elbe dike. The project includes environmental compensation measures to offset the impact on nature and landscape. Specifically, the compensation measure (A1) requires the planting of 296 Flatter elms, 100 English oaks, 15
This contract opportunity is for custodial services at the property of the State Enterprise for Flood Protection and Water Management in Halle (Saale). The services required include maintenance of the outdoor areas, winter services, maintenance and inspection of building technical facilities, and ge
This contract involves the provision of external monitoring services, surveying, quantity assessment, and documentation necessary for the construction project "HWSB Dike Hohenwarthe km 0.1 - 1.126". The project includes the renovation and elevation of the existing Elbe dike, approximately 1100 meter
This contract involves providing safety and health coordination services (SiGeKo) in accordance with the Construction Site Ordinance (BaustllV) and AHO publication No. 15 for the construction project "HWSB Dike Hohenwarthe km 0.1 - 1.126". The project includes the renovation and elevation of the exi
This contract involves the provision of various professional services related to the construction project at HWSB Göbitz. Key responsibilities include: monitoring construction performance as per the project requirements, coordinating safety and health protection measures, overseeing environmental co
The State Enterprise for Flood Protection and Water Management of Saxony-Anhalt (LHW) is planning the construction of the Hohenweiden dike, which includes sections in Benkendorf, Rockendorf, and Hohenweiden. Due to the project's large scope, it has been divided into two construction lots. Lot 1 invo
This contract involves ecological support and monitoring for a construction project located east of the K1020 county road, within the Elbdeich water management area. The area is primarily agricultural land and grassland. To prevent flooding from drainage water, the Elbdeich water management system m
This contract involves the construction of a new pumping station with a free sluice between the right Aland dike 1 and right Aland dike 2, aimed at managing drainage water from the Aland and Elbe rivers. The project site is located east of the K1020 county road, within the Elbdeich water management
This contract involves the supervision and management of flood protection works along a 2.9 km section of the dike, starting from the L2 road near the B189 and ending near Voßhof. The project includes the renovation of the existing dike, creating a 5.00 m wide protective strip on both sides, and min