This contract involves the provision of various professional services related to the construction project at HWSB Göbitz. Key responsibilities include: monitoring construction performance as per the project requirements, coordinating safety and health protection measures, overseeing environmental co
Tender closed on 11 Aug 2025. Awaiting award.
No single supplier dominates the field.
In engineering, STATE ENTERPRISE FOR FLOOD PROTECTION AND WATER MANAGEMENT SAXONYANHALT has awarded 12 contracts to 9 suppliers.
+3 more suppliers
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves the provision of ecological construction supervision services for waterway construction, renovation, and sewer rehabilitation. Suppliers will be responsible for consulting on the integration of nature and environmental protection considerations into construction execution. Key
This contract involves landscaping work as part of the renovation of the right Elbe dike. The project includes environmental compensation measures to offset the impact on nature and landscape. Specifically, the compensation measure (A1) requires the planting of 296 Flatter elms, 100 English oaks, 15
This contract opportunity is for custodial services at the property of the State Enterprise for Flood Protection and Water Management in Halle (Saale). The services required include maintenance of the outdoor areas, winter services, maintenance and inspection of building technical facilities, and ge
This contract involves the provision of external monitoring services, surveying, quantity assessment, and documentation necessary for the construction project "HWSB Dike Hohenwarthe km 0.1 - 1.126". The project includes the renovation and elevation of the existing Elbe dike, approximately 1100 meter
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.