This contract involves the purchase and installation of two transformers with a voltage of 110/15 kV and a target capacity of 40 MVA for the Tomaszów 1 substation. Suppliers are invited to submit proposals for the provision of these electrical equipment and installation services. The deadline for su
Contract awarded. Originally published 5 months ago.
PGE Dystrybucja S.A. is seeking suppliers for the delivery of high voltage switches in 2027. This contract includes detailed specifications outlined in the procurement documents, particularly in Annex 1 of the Terms of Reference. Suppliers are encouraged to review these documents to understand the r
This contract involves the construction and modernization of medium voltage power lines in the Sokółka and Krynki areas, managed by PGE Dystrybucja S.A. The detailed specifications can be found in Attachments 1 and 1.1 of the procurement documents. The contractor or subcontractor must employ workers
This contract involves the modernization of the 110/15 kV RPZ-9 Białystok substation, operated by PGE Dystrybucja S.A. in Białystok. Suppliers are required to refer to Annex 1 and 1.1 of the procurement documents for detailed specifications. The contractor or subcontractor must employ workers under
This contract involves establishing a framework agreement for the development of the Central Measurement Data Repository system over a period of three years. The procurement process is conducted in accordance with the Public Procurement Law, specifically through a negotiated procedure based on Artic
Opportunity to establish and operate a collaborative Partner Testing Point facility in Iraq for quality assurance and product validation services.
Seek experienced integrated consultant team to manage design and delivery of new primary school and nursery unit in Derry/Londonderry using RIBA professional standards.
Provide independent design assurance and technical oversight for the UKHSA Health Security Campus programme, ensuring all designs meet safety, regulatory, and operational standards.
Replacement of UPS systems, busbar infrastructure, and electrical safety components to enhance operational resilience at the Colindale facility.