This contract involves essential construction services for the final stabilization of unsecured areas as part of geotechnical hazard prevention measures at Knappensee. The work includes: (1) Geotechnical stabilization of the "landslide basin," profiling of the eastern slope, land filling in area F,
Tender closed on 3 Jun 2025. Awaiting award.
This contract involves professional tree inspections conducted from the ground, following the FLL tree inspection guidelines. The inspections will be carried out as a 'negative control' and documented accordingly. The areas to be inspected typically cover approximately 12,800,000 square meters and w
This contract involves conducting a comprehensive water management study aimed at developing a water network and quality that addresses conservation, mining, and water law concerns while minimizing the long-term impacts of lignite mining. The study area covers the former mining regions of Schlabendo
The owner intends to secure the future use standard and enhance the properties in Sondershausen by undertaking the structural renovation of the "Petersenschacht" building complex. This includes addressing existing damage to the building structure (roof/facade), foundation lines, building foundation,
This contract involves the examination of post-mining lakes and surface water measurement points. The work includes navigating various sizes of post-mining lakes by boat, recording depth profiles, collecting water and plankton samples, and analyzing these samples according to MHM standards. The resu
Single-party framework contract for fire-stopping and fire-prevention services to seal structural gaps and prevent fire spread across compartments in Irish buildings.
Contractors sought to complete a 4-week mechanical, electrical, and general refurbishment upgrade of Ardglass parish church, commencing September 2026 under PEACEPLUS funding.
Secondary school construction project for science lab upgrades and building-wide insulation improvements at Glanmire Community College, Ireland.
Rehabilitation and repair project for 12 bridges on regional and local roads across water courses in County Westmeath during 2026.