SYNDICAT MIXTE DU LAC DANNECY
A United Kingdom buyer, with 8 published contracts, worth £4.5m, most recently 5 months ago.
Top 5 suppliers won 93% of awarded value — £8.3m of £8.9m across 10 awards.
This project involves the construction of gravity collectors (Ø200) along the D114 Route du Mont, covering a length of 385 meters. It includes the installation of 13 connections (Ø160), with 12 connections on the main road and 1 connection on private land. Suppliers are invited to provide services r
This project involves the construction of gravity collectors (Ø 200) on public roads (320 meters on RD5, 121 meters on RD 141, 180 meters on Route du Chainet, and 60 meters on Allée de la Ravoire) and private properties (204 meters on private roads, 332 meters in fields, and 43 meters in courtyards
This project involves the construction of a gravity sewer collector with a diameter of 200 mm, extending 620 meters. It also includes the installation of 20 inspection chambers with a diameter of 1000 mm and the creation of 215 meters of connections with a diameter of 160 mm. The total value of the
This project involves the second phase of construction work on the Greenway along the west bank of Lake Annecy, specifically between Sevrier and Doussard, covering a distance of 2.3 kilometers. Key tasks include: widening the paved path to 5 meters using light-colored plant-based asphalt, creating a
This contract involves the restoration of vehicle bodies and the periodic maintenance and mechanical repairs for a fleet of light and utility vehicles with a maximum authorized weight of less than 3.5 tons. The fleet includes 57 units, which may change over time. It consists of 51 leased vehicles: 1