This project involves the construction of a gravity sewer collector with a diameter of 200 mm, extending 620 meters. It also includes the installation of 20 inspection chambers with a diameter of 1000 mm and the creation of 215 meters of connections with a diameter of 160 mm. The total value of the
Contract awarded. Originally published 8 months ago.
No single supplier dominates the field.
In construction, SYNDICATE OF LAKE ANNECY has awarded 5 contracts to 5 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves the construction and expansion of bicycle paths along the Voie Verte du Lac d'Annecy. The work includes widening the paved path to 5 meters, applying light-colored plant-based asphalt, creating a 1.30-meter pedestrian shoulder along the lake, rehabilitating existing structures
This project involves the construction of gravity collectors (Ø200) along the D114 Route du Mont, covering a length of 385 meters. It includes the installation of 13 connections (Ø160), with 12 connections on the main road and 1 connection on private land. Suppliers are invited to provide services r
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater network managed by SILA is located in the area affected by the road widening works on the straight se
The Haute-Savoie Department is undertaking roadworks on the RD1508 in Sillingy and Metz-Tessy, covering over 4 km between the RD3508 junction and the Balme-de-Sillingy bypass. An existing wastewater treatment network managed by SILA is located in the area affected by the road widening works on the s
Donegal County Council is seeking construction contractors and suppliers for enhancement works on the Daisy building in Carndonagh.
Dublin City Council is tendering for construction of a 1.2km active travel scheme on Milltown Road featuring segregated cycling facilities, improved pedestrian access, and junction upgrades as part of its citywide sustainable transport network expansion.
Fire safety compliance upgrade project for 82 Dublin apartments including wall upgrades, firestopping, fire-rated doors, and detection systems across two phases.
Clúid Housing invites qualified construction contractors to bid on a design-and-build project delivering 36 homes and a community centre in Leixlip, Ireland.