A United Kingdom buyer, with 4 published contracts, worth £1.5m, most recently 9 months ago.
Top 4 suppliers won 100% of awarded value — £1.5m of £1.5m across 4 awards.
This contract involves construction work for school buildings, divided into two phases: first, the new construction of the buildings, followed by the renovation of existing structures. Suppliers should note that there will be a significant time gap between these two phases. The total value of the co
This contract involves roofing, insulation, and plumbing works to be carried out in two phases: first, new construction, followed by the renovation of existing structures. Suppliers should note that there will be a significant time difference between these two phases.
This contract involves scaffolding work to be carried out in two phases: first, the construction of new buildings, followed by the renovation of existing structures. It is important to consider a significant time difference between these two phases.
The contract involves the installation of various plumbing and heating systems. Key components include: 262 meters of wastewater piping, 496 meters of drinking water piping, 82 free-flow angled seat valves, 19 compact wall-mounted toilets, 18 sinks, 14 single-lever basin mixers, 50 installation syst