This contract involves scaffolding work to be carried out in two phases: first, the construction of new buildings, followed by the renovation of existing structures. It is important to consider a significant time difference between these two phases.
Contract awarded. Originally published 9 months ago.
This contract involves construction work for school buildings, divided into two phases: first, the new construction of the buildings, followed by the renovation of existing structures. Suppliers should note that there will be a significant time gap between these two phases. The total value of the co
This contract involves roofing, insulation, and plumbing works to be carried out in two phases: first, new construction, followed by the renovation of existing structures. Suppliers should note that there will be a significant time difference between these two phases.
The contract involves the installation of various plumbing and heating systems. Key components include: 262 meters of wastewater piping, 496 meters of drinking water piping, 82 free-flow angled seat valves, 19 compact wall-mounted toilets, 18 sinks, 14 single-lever basin mixers, 50 installation syst
SYMCA seeks an experienced organization to extend the operational life of 25 Siemens trams through a comprehensive maintenance and upgrade program ensuring safety and reliability until 2035.
Heating control replacement works at Poplar Primary School scheduled for summer 2026, with tenders to be submitted via the London Tenders Portal.
Suppliers are invited to bid for the supply and installation of playground equipment including a multi-play frame and youth shelter at Oakley Coronation Park.
Electrical services replacement project at Wimbledon Chase Primary School scheduled for summer 2026, with tenders to be submitted via the London Tenders Portal.