This contract involves the construction of wastewater treatment plants and energy recovery facilities in Iasi County, Romania. The project includes multiple sites, each with specific components such as mechanical treatment, biological treatment, UV disinfection, and sludge management. The facilities
Contract awarded. Originally published 5 months ago.
APAVITAL S.A., the contracting entity, is seeking to purchase pressure reducers. These devices will be used for both the maintenance of existing water distribution systems and the development of new systems. The pressure reducers will be utilized by production sectors to regulate water pressure in t
APAVITAL S.A., as the contracting entity, is seeking to procure the following services: LOT 1 - Cleaning services for wastewater channels, retention baskets, and waste collection grates in the Metropolitan Area of Iasi. LOT 2 - Cleaning services for wastewater channels, retention baskets, and waste
This contract involves the procurement of various chemicals essential for water treatment processes. The required chemicals include: 40% Ferric Chloride, 25% Sodium Chlorite, 7.7% Sodium Chlorite, 9% Hydrochloric Acid, crystalline Aluminum Sulfate, Silicic Aluminum Acid, anionic polyacrylamide polym
APAVITAL S.A., as the contracting entity, seeks to purchase "Quarry and Crushed Stone Products". These products will be used by production sectors to ensure the bedding for pipelines and to restore the site to its original condition following interventions on water and sewage networks by APAVITAL S.
Mercy College Beaumont is seeking contractors for heating system replacement, electrical upgrades, and new bike shelter installation as part of a 2026 climate action project.
Coolmine Community School in Ireland is accepting tender submissions for the supply and installation of a sports hall floor.
Emergency mechanical engineering works to upgrade heating (converting to LPG) and water services systems at a school in Ireland.
Tender for fire safety remedial construction works to stairwells and corridors at Kare McMahon Centre, Kilcullen, Ireland, with completion required by December 2026.