The Schwimmerbund BAYERN 07 association is renovating the existing outdoor swimming pool at Pulversee 1 in Nuremberg. In March 2026, the demolition of the existing supervision and technical building (approximately 650 m³) will begin, along with partial demolition of the two large pools. The entrance
Contract awarded. Originally published 7 months ago.
St Oswald's Church seeks suppliers for a major structural, interior, and systems restoration project funded through National Lottery Heritage grant support.
Contract opportunity for preventative maintenance, servicing, and repairs of fire fighting equipment across NHS trust locations in Northern England through 2026.
Paint and decorate internal areas of Dudley Council homes and communal spaces across flats and sheltered housing schemes.
Design and build project for 12 modular homes including site preparation and installation at Duck Lane.