This procurement opportunity involves the supply of low voltage distribution boards and main transformer boards. The contract is divided into two lots: Lot 1 focuses on the delivery of low voltage distribution boards, while Lot 2 pertains to the supply of main transformer boards. The estimated quant
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In engineering, Electrodistrubution Networks West EAD has awarded 7 contracts to 6 suppliers.
Across engineering, the most active winners are BRODOMERKUR ENERGETIKA d.o.o., DRIBO, spol. s r.o., SUNBELT RENTALS LIMITED — the field to beat, or your route in as a partner.
The management board of 'Electrodistribution Networks West' EAD is initiating an open public procurement procedure to contract representatives from consumer associations. The goal is to ensure the interests of clients during inspections and the preparation of reports in cases of inaccurate measureme
This procurement opportunity involves the supply of low voltage cable distribution cabinets over a period of 48 months. The contract is divided into two lots: Lot 1 includes high polyester cabinets with various configurations and quantities, while Lot 2 includes low polyester cabinets with similar c
This procurement contract involves the supply of low voltage cable distribution cabinets over a period of 48 months. The contract is divided into two lots: Lot 1 includes high polyester cable distribution cabinets with various configurations and quantities, such as cabinets with 4, 5, 6, and 7 verti
This public procurement contract is for the supply of three-phase oil-filled hermetically sealed distribution transformers up to 800 kVA, 20/0.4 kV, for the Dupnitsa warehouse. The contract involves establishing framework agreements with potential suppliers for the delivery and purchase of these tra
Register as a pre-qualified supplier to compete for park tree maintenance and arboricultural works projects through this dynamic purchasing system.
Open Dynamic Purchasing System for arboricultural and tree works services supporting London's housing projects.
Ballina seeks suppliers to design, supply, install, and maintain programmable festival lighting infrastructure for four town locations available year-round.
Hertford seeks a certified contractor to install, maintain, and provide 24-hour emergency support for festive lighting displays across the town for three years from August 2027.