This procurement opportunity involves the supply of low voltage cable distribution cabinets over a period of 48 months. The contract is divided into two lots: Lot 1 includes high polyester cabinets with various configurations and quantities, while Lot 2 includes low polyester cabinets with similar c
Contract awarded. Originally published 8 months ago.
No single supplier dominates the field.
In engineering, Electrodistrubution Networks West EAD has awarded 7 contracts to 6 suppliers.
Across engineering, the most active winners are BRODOMERKUR ENERGETIKA d.o.o., DRIBO, spol. s r.o., SUNBELT RENTALS LIMITED — the field to beat, or your route in as a partner.
The management board of 'Electrodistribution Networks West' EAD is initiating an open public procurement procedure to contract representatives from consumer associations. The goal is to ensure the interests of clients during inspections and the preparation of reports in cases of inaccurate measureme
This procurement contract involves the supply of low voltage cable distribution cabinets over a period of 48 months. The contract is divided into two lots: Lot 1 includes high polyester cable distribution cabinets with various configurations and quantities, such as cabinets with 4, 5, 6, and 7 verti
This public procurement contract is for the supply of three-phase oil-filled hermetically sealed distribution transformers up to 800 kVA, 20/0.4 kV, for the Dupnitsa warehouse. The contract involves establishing framework agreements with potential suppliers for the delivery and purchase of these tra
The public procurement procedure is being conducted by "Electrodistribution Networks West" EAD for the purpose of connecting new consumers through the reconstruction and construction of overhead and underground medium voltage (MV) and low voltage (LV) networks, as well as electrical equipment for tr
Register as a pre-qualified supplier to compete for park tree maintenance and arboricultural works projects through this dynamic purchasing system.
Open Dynamic Purchasing System for arboricultural and tree works services supporting London's housing projects.
Ballina seeks suppliers to design, supply, install, and maintain programmable festival lighting infrastructure for four town locations available year-round.
Hertford seeks a certified contractor to install, maintain, and provide 24-hour emergency support for festive lighting displays across the town for three years from August 2027.