This contract involves the design and construction of a high-efficiency gas cogeneration plant with a capacity of 7.4 MWe and 7.0 MWt in Malbork. The work includes the construction of electrical lines: a 15 kV line connecting the plant to the grid and a 110 kV line for power distribution. The contra
Tender closed on 28 Aug 2025. Awaiting award.
Supply of electricity and gas services to multiple Onward Group sites with flexible metering and billing arrangements.
Nottingham City Council seeks a provider to operate its district energy network and supply heat to 5,000 homes and electricity to the Council under a long-term agreement.
Home Group Limited is seeking a heat network Metering and Billing provider to manage annual metering, billing, equipment maintenance, and meter installations.
Network Rail seeks a renewable energy supplier to develop behind-the-meter generation on its DC traction network under a Direct Power Purchase Agreement framework, with potential expansion to 40GWh annually.