Construction of Water and Wastewater Pipelines in Baião, Portugal
This contract involves the construction of sanitation and water supply networks in Baião, Portugal. The project is valued at approximately €3,742,185.72 and is being managed by Águas do Norte, S. A. Suppliers are invited to provide services related to the construction of these essential infrastructu
Decision brief
4 fields- Contract value€3,742,186Euros
- Closing dateRollingNo closing date published
- SectorBrowse related listings
- LocationPortugal
Suppliers
3 suppliers- RESTRADAS REVITALIZATION OF NORTHERN ROADS LDALead contractor
- Restradas - Road Revitalization of the North, LtdLead contractor
- M. dos Santos & Cia., S. A.Consortium partner
Lifecycle
AwardedContract awarded. Originally published 1 years ago.
Brief
Track record
4 awards · 4 winnersNo single supplier dominates the field.
In construction, GUAS DO NORTE S A has awarded 4 contracts to 4 suppliers.
- PRODIGIPADRÃO. LDA1× · 25%
- PRODIGIPADRO LDA1× · 25%
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, PDP MECHANICAL & ELECTRICAL LIMITED — the field to beat, or your route in as a partner.
More from GUAS DO NORTE S A
Supply of Flocculants for Water Treatment Stations in Portugal
This contract opportunity is for the supply of flocculants to Águas do Norte, S.A., which operates water treatment stations in Portugal. The total value of the contract is €4,050,000. Suppliers are invited to provide flocculants that meet the specifications required for effective water treatment. Th
Technical Design Services for Civil Engineering Projects in Portugal
This contract involves the acquisition of studies and projects related to infrastructure for wastewater treatment, water capture and treatment, and energy neutrality initiatives. Suppliers are invited to provide technical design services that will contribute to the development of these essential inf
Water and Wastewater Pipeline Construction in Portugal
This contract involves the construction of water and wastewater pipelines as part of the project PRC_0343/2024_GAE-AA1161. The work includes connecting the streets R. V. Chã and R. Seixinha (Pt. da Barca) and establishing connections to the streets Gondomil, Outeiro, Sete Bicas, Verdoejo, and R5 in
Pump Equipment Acquisition for Águas do Norte, S.A.
This contract opportunity involves the procurement of electric pump groups for Águas do Norte, S.A. The total value of the contract is €1,031,500. Suppliers are invited to submit their bids by the deadline of October 16, 2025. This procurement falls under the machinery sector and is published on the
Open in Construction
Divis Peatland Restoration Phase 2 - National Trust Northern Ireland
National Trust Northern Ireland seeks suppliers for Phase 2 of the Divis Peatland Restoration Project through the Proactis Plaza portal, with bids due 31st August 2026.
Cork Education and Training Board - Douglas Street Campus Building Upgrade
Cork ETB invites experienced contractors to bid on building upgrade works for Douglas Street Campus, including studios, labs, and educational facilities.
North Kent Infrastructure Works for Grazing Project
Kent County Council seeks a contractor to deliver conservation-sensitive infrastructure works including fencing, gates, and water systems across multiple protected sites in North Kent between Autumn 2026 and Autumn 2027.
Rainwater Management Framework - North West England
United Utilities is establishing a framework to deliver large-scale rainwater management and sustainable drainage solutions across the North West of England to reduce storm overflow impacts and improve water management.