Awarded contract

Boiler Repair and Maintenance Services in Tychy

Awarded
PLN 1.3m
Published 26 Jun 2025

This contract involves the ongoing repair of the BFB boiler at the Tychy Heat and Power Plant. The work includes inspections and necessary repairs of malfunctioning, damaged, or worn-out equipment and components in water and steam installations. Additionally, it involves cleaning the bottom of the n

PolandPublished 26 Jun 2025· 1 years agoTED

Decision brief

4 fields
  • Contract value
    PLN 1,318,980
    PLN
  • Closing date
    Rolling
    No closing date published
  • Sector
    Browse related listings
  • Location
    Poland

Suppliers

2 suppliers

Lifecycle

Awarded

Contract awarded. Originally published 1 years ago.

26 June 2025
Awarded — no open tender advertised

Brief

This contract involves the ongoing repair of the BFB boiler at the Tychy Heat and Power Plant. The work includes inspections and necessary repairs of malfunctioning, damaged, or worn-out equipment and components in water and steam installations. Additionally, it involves cleaning the bottom of the nozzle, air box, heating surfaces of the combustion chamber, superheaters, water heaters, air heaters, and the removal of deposits. A detailed description of the contract requirements is provided in Annex 1 of the draft contract terms.

Track record

2 awards · 2 winners
Thin record

Only 2 prior awards here — too little to read.

In facilities management, TAURON HEAT LTD has awarded 2 contracts to 2 suppliers.

Who wins here

Across facilities management, the most active winners are NHS SUPPLY CHAIN COORDINATION LIMITED NHSSC SCCL, TUNSTALL HEALTHCARE UK LTD, GE HEALTHCARE LIMITED — the field to beat, or your route in as a partner.

More from TAURON HEAT LTD

4 listingsView all →
ConstructionPoland

Construction Work for External Installation Reconstruction in Sosnowiec

This contract involves the reconstruction of the external reception installation at GWC Mościckiego 14 in Sosnowiec as part of the TERMIC Project (TAURON Efficiency, Development, Modernization of Heating Infrastructure). The work must be carried out according to the project documentation, and the co

TAURON HEAT LTD
Published 13 Oct 2025
Energy & UtilitiesPoland

Supply of Limestone Sorbent for TAURON Ciepło Power Plant

This contract involves the ongoing supply of limestone sorbent to TAURON Ciepło sp. z o.o. The estimated quantities required are as follows: 1) Granulated limestone sorbent with a size of 0.1-0.4mm: a) 5,800 Mg for the EC1 Power Plant in Bielsko-Biała (with a possibility of directing up to 15% of de

TAURON HEAT LTD
Published 12 Oct 2025
ConstructionPoland

Construction of High-Parameter Heating Network in Dąbrowa Górnicza

This contract involves the construction work for the reconstruction of a high-parameter heating network between chamber 1273C9 and chamber 1273C10 (1276C10) in the area of Kopernika Street, Dąbrowa Górnicza. The work will be carried out based on the provided project documentation, and the completed

TAURON HEAT LTD
Published 1 Sept 2025
Transport & LogisticsPoland

Rail Transport Services for Coal Delivery

This contract opportunity involves providing rail transport services for coal to various power plants operated by TAURON Ciepło sp. z o.o. Suppliers will be responsible for transporting coal using their own rail vehicles along the lines of PKP Polskie Linie Kolejowe S.A. or other infrastructure mana

TAURON HEAT LTD
Published 31 Jul 2025

Open in Energy & Utilities

4 open listingsView all →