This contract involves the procurement of six delivery vehicles. Detailed specifications can be found in Parts II and IV of the procurement documents. The contracting authority allows equivalent solutions to those described in the procurement documents, provided they meet or exceed the required char
Tender closed on 21 Jul 2025. Awaiting award.
This contract involves the supply of a mobile field for electric power transmission and operation. Detailed specifications can be found in Part II of the Terms of Reference. The contracting authority allows equivalent solutions to those described, provided they meet or exceed the required characteri
This contract opportunity involves conducting inspections and providing repair services for DLF type circuit breakers at the PSE S.A. electrical substations. The contract is divided into five packages, each corresponding to a different operational area of PSE S.A.: a) Package I – Warsaw, b) Package
This contract involves the supply of a mobile field for the transmission and operation of electrical energy. Detailed specifications can be found in Part II of the Terms of Reference. The contracting authority allows equivalent solutions to those described, provided they meet or exceed the required
This contract involves the supply of current and voltage transformers for the equipment of the Ordering Party's stations. The contract is divided into five parts: - Part 1: Supply of transformers for the project: Expansion of the 400/110 kV Ełk Bis station along with the reconstruction of the 220/11
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.