The city of Neuss is developing a public park on a 38-hectare site that was previously a racetrack, in preparation for the Landesgartenschau Neuss 2026. This project involves renovating and converting the currently unused "Hammfeldhof" building complex, which includes a residential building and two
Contract awarded. Originally published 3 months ago.
The project area, Gewerbegebiet-Nord, covers approximately 100 hectares and is divided into two construction phases: the first phase is about 43 hectares, and the second phase is about 47 hectares, located in the northern part of Elsdorf. The currently agricultural land is set to be developed into a
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026 on a 38-hectare site that was previously a racetrack. As part of this project, the currently unused "Hammfeldhof" building complex, which dates back to 1968 and includes a residential building and two former stable bu
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026 on a 38-hectare site that was previously a racetrack. As part of this project, the currently unused Hammfeldhof building complex, which dates back to 1968 and includes a residential building and two former stable buil
The city of Neuss is developing a public park for the Landesgartenschau Neuss 2026, managed by Landesgartenschau Neuss 2026 GmbH. This project involves renovating the currently unused Hammfeldhof building complex, which includes a residential building and two former stable buildings, originally cons
Karbon Homes is seeking a contractor to provide disabled home adaptations and aids services across the North East of England for residents in private and tenanted properties.
Contractor required for expansion works at Farnham and Ash Secondary School to increase school capacity.
Contractor needed for expansion construction works at Hoe Valley 1FE School.
Contractor needed for Bishop Wand School construction works expansion in Spelthorne.