WASSERSTRAENNEUBAUAMT MAGDEBURG
A United Kingdom buyer, with 4 published contracts, worth £213.2m, most recently 9 months ago.
Top 4 suppliers won 100% of awarded value — £213.2m of £213.2m across 4 awards.
This contract involves providing structural planning review services for the Kachlet Double Lock rehabilitation project. Suppliers are invited to submit proposals for the examination of execution documents to ensure they meet the necessary static and structural requirements. The total value of the c
The project involves the renovation of the Kachlet ship lock facility, which will cause environmental impacts as per German law. The contractor is responsible for avoiding, mitigating, or compensating for these impacts. To address these concerns, specific measures have been developed as part of the
The Kachlet Weir, which includes a dam, hydropower plant, and lock system, was built between 1922 and 1927 and is located at river kilometer 2230 in Passau. The Waterways and Shipping Authority (WNA) Magdeburg, WNA Aschaffenburg, and WSA Donau MDK are planning essential rehabilitation work on the lo
The project involves the comprehensive renovation of the Kachlet double lock, built between 1922 and 1927. The lock consists of two chambers, separated by a 14-meter wide central wall, each with a usable width of 24 meters and a length of 230 meters. The current condition of the structure necessitat