RIJKSWATERSTAAT PROGRAMMAS PROJECTEN EN ONDERHOUD
A United Kingdom buyer, with 9 published contracts, worth £94.8m, most recently 3 months ago.
Top 5 suppliers won 100% of awarded value — £94.8m of £94.8m across 9 awards.
This contract involves dredging and pumping services primarily focused on maintaining the Eemsgeul waterway. The contractor will be responsible for the following tasks: 1. Conducting maintenance dredging based on a dredging program for the following areas: • Eems waterway – North Sea; • Access chann
The 2008 tender involves an integrated DBFM contract for the design, construction, financing, and maintenance of the 2nd Coentunnel until December 21, 2037. Due to previous years' changes not being published, the project team is now conducting a recovery operation with this bundled publication to fu
This contract involves engineering and executing replenishment works along the Dutch coast to prevent coastal erosion. Suppliers are invited to refer to Chapter 2 of the procurement guidelines for detailed information on the requirements and processes. The deadline for submissions is November 25, 20
This contract opportunity involves engineering and executing replenishment works along the Dutch coast to prevent coastal erosion. Suppliers are invited to refer to the tender guidelines for detailed information on the requirements and submission process. The deadline for submissions is December 1,
This project involves the procurement of standard maintenance and minor variable maintenance for the main waterway from Lemmer to Delfzijl in Northern Netherlands. The tender is divided into two lots: 1. Green Spaces and Banks 2. Civil Engineering, Mechanical and Electrical Works, and Information Te
This contract involves conducting laboratory analyses of water sediment samples and producing synthesis reports. The goal is to identify suitable sand extraction areas for coastal management. Suppliers are invited to provide their services for this work, which is essential for maintaining the coastl
This contract involves the construction of Road Weather Information System (RWIS) measurement locations based on a site design. It includes the dismantling of old GMS measurement locations, as well as the management and maintenance during the construction phase. Rijkswaterstaat acts as the purchasin
This project involves the expansion of the A12 highway, which includes adding extra lanes and a complete reconstruction of the road. Key components of the work include realigning the road, constructing new overpasses and underpasses, connecting to the local road network, implementing noise reduction
This contract focuses on the large-scale implementation, replacement, and simplification of Dynamic Traffic Management (DVM) systems and Public Lighting (PL) as part of Programs, Projects, and Maintenance (PPO). The contractor will primarily perform the following tasks: improve and renew (design, im