A United Kingdom supplier, with 2 awarded contracts, totalling £6.4m, most recently 3 months ago.
This contract involves the replacement of installations in the fifth tranche, which includes the following: Station Elevators and Escalators at Amsterdam Amstel (Elevators 001, 002), Amsterdam Muiderpoort (Elevator 002), Boxtel (Elevators 001, 002, 003, 004), Painting of the Traverse at The Hague HS
This contract involves the restoration of the roadway at Halfweg, specifically between KM 7.756 and 8.948 in geocode 084. The work includes: - Constructing a soil-retaining structure using sheet piles with soil anchors (approximately 400 meters) - Reshaping the slope (approximately 220 meters) - Rep