Reinstate the Nent Haggs site in Cumbria for agricultural use through comprehensive land remediation and restoration services.
Contract awarded. Originally published 3 days ago.
Survey and assess a raw water main in the North Pennines to determine its suitability for trenchless rehabilitation as part of a mine water project.
Opportunity to design and install a replacement culvert on the Stryt Y Scweiar channel, which handles mine water and surface water flows, with contractor input welcomed on design methodology.
Contract to restore channel stability at Parc Mine by clearing river debris, strengthening weir structures, and establishing site access following a slope failure.
Environmental restoration project at a historic Welsh metal mine site involving water management infrastructure, ecological protection, and heritage conservation work.
Bury-based suppliers can apply year-round to the Council's 32-lot supplier list for below-threshold procurement opportunities across various service categories.
Establish a supplier pool for forest field data collection services including surveys, equipment installation, GIS mapping, and habitat classification work across multiple woodland and research sites.
Catering services provider needed for five London schools in the Success for All Educational Trust with an initial 3-year contract and optional 2-year extension.
Recruit a contractor to protect breeding wader populations at Warslow Moors Estate through annual predator control activities from January to June over three years with an optional two-year extension.