Rendering Works for Magic Circle Building
Mace Dragados is seeking a specialized subcontractor to perform rendering works on the Magic Circle building, a listed structure located near Euston Station in London. The project includes the installation of a steel framing system, insulation, rendering, and brick/block work up to a height of 3.4 m
Decision brief
4 fields- Contract valueest.£500,000Pounds sterling
- Tender closed3 Sept 202511 months ago
- SectorBrowse related listings
- LocationUnited Kingdom
Lifecycle
ClosedTender closed on 3 Sept 2025. Awaiting award.
Brief
More from MACE DRAGADOS
Highways and Environmental Consents Consultant
Mace Dragados is seeking a specialist consultant to manage and secure various consents related to highways, environmental regulations, land and property, and heritage compliance. The consultant will be responsible for the following key tasks: 1. **Highways Consents and Assurance**: Lead the process
Operation and Maintenance Manuals
Mace Dragados is seeking a specialist to provide Operations and Maintenance (O&M) manual compilation services for the HS2 Euston Station project. This contract may also be used for the HS2 Curzon Street project in Birmingham. The goal is to appoint a technical author who will work on a package-by-pa
Temporary Pedestrian Bridge Installation
Mace Dragados is seeking suppliers to design, fabricate, and install a temporary pedestrian footbridge at the HS2 Euston Station site in London. This project involves several key phases: 1. **Installation**: The footbridge will be installed to align with the existing ground level on pad foundation
Steelwork for Link Bridge and Lift Shaft
Mace Dragados is seeking a subcontractor for steelwork services. The project involves the following key components: 1. Design, supply, fabrication, installation, and erection of a 13.2-meter long and 2.1-meter wide link bridge that connects the first floors of the Maria Fidelis Old School Building a
Open in Construction
Energy Efficiency Upgrades for Unit 1I at Scioból na bhFear, Gaoth Dobhair
Comprehensive energy efficiency and accessibility upgrade project for Unit 1I at Scioból na bhFear featuring new stairway, accessible facilities, and mechanical system improvements.
Heating and Ventilation Services for Spideal Language Commissioner Building - Unit 2
Heating and ventilation system replacement and ductwork modifications for a Gaeltacht regional authority office building in County Galway.
Waste Clearance Contract - Bolton House Road, Wigan
Urgent contract to remove 18,000 tonnes of illegally deposited waste from Bolton House Road, Bickershaw, with a compressed 15-day tender timeline due to public health and fire safety risks.
Divis Peatland Restoration Phase 2 - National Trust Northern Ireland
National Trust Northern Ireland seeks suppliers for Phase 2 of the Divis Peatland Restoration Project through the Proactis Plaza portal, with bids due 31st August 2026.