This contract opportunity involves scheduled inspections, maintenance, and repairs of electrical equipment at PGE EC S.A. in Gorzów Wielkopolski from 2026 to 2029. The work is divided into several parts: 1) Repairing faults and failures in electrical devices and installations; 2) Periodic inspection
Tender closed on 14 Jan 2026. Awaiting award.
PGE Energia Ciepła S.A. is seeking suppliers to provide repair and maintenance services for the modernization of the dampers and compensators of condenser block number 2. This project aims to enhance the efficiency and reliability of the energy production process. Interested suppliers should be prep
This contract involves the dismantling of decommissioned equipment at the PGE EC S.A. branch in Gorzów Wielkopolski. Suppliers are invited to provide services related to the safe and efficient removal of these items. Detailed specifications can be found in Annex 1 of the procurement documents. The t
This contract involves the supply of a grinding system specifically designed for the 7M65-E mill at PGE Energia Ciepła S.A., located in the Bydgoszcz district. The project aims to enhance the milling capabilities of the facility, which is crucial for its operations in energy production. Suppliers ar
This contract opportunity involves the medium repair of two generators: the 230MK (G3) located in Gdańsk and the 320MK (G2) located in Gdynia. Suppliers are invited to provide services related to the repair and maintenance of these generators. The work aims to ensure the efficient operation of the g
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.