This project (C-MLT002) aims to establish effective monitoring of track stability across three key corridors: Schiphol-Amsterdam-Almere-Lelystad (SAAL), Tilburg-Meteren-Boxtel, and Alkmaar-Amsterdam (AA). The monitoring results will help determine how increased frequency and/or speed of train passag
Contract awarded. Originally published 7 months ago.
Only 2 prior awards here — too little to read.
In engineering, PRORAIL BV has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are GO ENERGY LT, KYOCERA DOCUMENT SOLUTIONS (UK) LTD, Senergos, a.s. — the field to beat, or your route in as a partner.
This contract involves the replacement of installations in the fifth tranche, which includes the following: Station Elevators and Escalators at Amsterdam Amstel (Elevators 001, 002), Amsterdam Muiderpoort (Elevator 002), Boxtel (Elevators 001, 002, 003, 004), Painting of the Traverse at The Hague HS
This contract involves establishing a framework agreement with two parties to conduct network analyses for the traction energy supply network (TEV network). The duration of the framework agreement is three years, with an option to extend for an additional year. Each assignment will have a budget of
ProRail is seeking suppliers to manage and maintain green areas in a more sustainable way. This contract focuses on the Amstelsepoort area, which includes approximately 144 kilometers of railway, 332 hectares of green space, and 149 kilometers of ditches. Suppliers will be responsible for the upkeep
ProRail is seeking suppliers to manage and maintain green areas in a more sustainable way. This contract focuses on the management of roadside vegetation in the Kennemerland area, which includes approximately 69 kilometers of railway, 87 hectares of roadside, and 62 kilometers of ditches. Suppliers
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.