This framework agreement involves the ongoing procurement of mineral-asphalt mixtures throughout 2026 for construction work in the city of Warsaw. The specific types and quantities of mixtures required are detailed in the attached document (Annex 1 to the procurement notice). Deliveries must comply
Contract awarded. Originally published 6 months ago.
This contract involves the delivery of two brand new backhoe loaders, manufactured in 2025. The procurement is divided into two parts: Part 1 involves the delivery of one backhoe loader, and Part 2 involves the delivery of another backhoe loader. The deliveries must comply with the specifications ou
This contract involves the delivery of three brand new four-axle trucks with a maximum weight of 34 tons, produced in 2025. The procurement is divided into three parts, each requiring the supply of one new truck. Suppliers must adhere to the specifications outlined in the attached documents. The tru
This contract opportunity involves the supply of brand new mini wheel loaders with side control, including necessary attachments. The loaders must be from the year 2025. The procurement is being conducted in parts, allowing for flexibility in delivery. Interested suppliers should refer to the provid
This contract involves the supply of a brand new truck with a maximum weight of 19 tons, equipped with a road sweeper. The vehicle must be from the year 2025 and comply with the specifications outlined in Annex 1 of the procurement documents. Additionally, the contract terms are detailed in Annex 2
Mercy College Beaumont is seeking contractors for heating system replacement, electrical upgrades, and new bike shelter installation as part of a 2026 climate action project.
Coolmine Community School in Ireland is accepting tender submissions for the supply and installation of a sports hall floor.
Emergency mechanical engineering works to upgrade heating (converting to LPG) and water services systems at a school in Ireland.
Tender for fire safety remedial construction works to stairwells and corridors at Kare McMahon Centre, Kilcullen, Ireland, with completion required by December 2026.