Closed contract

Construction and Renovation of Student Housing in Gembloux

Tender closed
19 Nov 2025
37 weeks ago

This contract involves the construction and renovation of 101 student housing units on the Gembloux Agro-Bio Tech campus of the University of Liège (ULiège) as part of Wallonia's recovery plan, specifically under sub-program 243 aimed at creating public interest housing for students. The project wil

BelgiumPublished 5 Nov 2025· 9 months agoTED
Tender deadline passed on 19 Nov 2025.

Decision brief

4 fields
  • Contract value
    Not disclosed
    Source did not declare a figure
  • Tender closed
    19 Nov 2025
    8 months ago
  • Sector
    Browse related listings
  • Location
    Belgium

Lifecycle

Closed

Tender closed on 19 Nov 2025. Awaiting award.

5 Nov 2025Today19 Nov 2025

Brief

This contract involves the construction and renovation of 101 student housing units on the Gembloux Agro-Bio Tech campus of the University of Liège (ULiège) as part of Wallonia's recovery plan, specifically under sub-program 243 aimed at creating public interest housing for students. The project will be executed in two phases to ensure continuous availability of student housing on campus: (1) the demolition of building G028 and the construction of a new building with 50 student housing units, and (2) the renovation of the existing building G029, which currently houses students, to meet current technical and comfort standards, along with improvements to the surrounding areas. The project must adhere to strict environmental and energy performance requirements, including the use of bio-based and reused materials, as well as rainwater management around the buildings, as specified in the technical specifications. The goal is to provide ULiège students with compliant and affordable housing on the Gembloux Agro-Bio Tech campus, following the pricing guidelines of the Centre for Sustainable Housing Studies (CEHD). All housing units and common areas must be designed to meet the conditions set by the recovery plan and detailed in the technical submission documents. Additionally, all rooms must be accessible or adaptable for individuals with reduced mobility.

Track record

1 award · 1 winner
Thin record

Only 1 prior award here — too little to read.

In construction, UNIVERSITY OF LIGE has awarded 1 contract to 1 supplier.

Who wins here
  1. FIRSTEP1× · 100%

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, PDP MECHANICAL & ELECTRICAL LIMITED — the field to beat, or your route in as a partner.

More from UNIVERSITY OF LIGE

4 listingsView all →
Research & InnovationBelgium

Supply and Installation of a Spectral Detection Flow Cytometer

This contract involves the supply of a spectral detection flow cytometer with cell sorting capabilities. The equipment will be made available to numerous researchers as it will be integrated into the flow cytometry technology platform at GIGA. The awarded supplier is required to implement measures t

UNIVERSITY OF LIGE
Published 11 Feb 2026
Healthcare & MedicalBelgium

Medical Imaging Equipment for Veterinary Use

This contract is part of a project to modernize and expand the medical imaging capabilities of the University Veterinary Clinic – Equine Department at the University of Liège. The project aims to equip the service with a state-of-the-art Cone Beam Computed Tomography (CBCT) system and fluoroscopy th

UNIVERSITY OF LIGE
Published 17 Dec 2025
Facilities ManagementBelgium

Supply and Installation of Interior Blinds for the University of Liège

This is a framework agreement for the supply and installation of interior blinds across all buildings of the University of Liège (ULiège). The contract is for a duration of 1 year, with the possibility of renewal for up to 3 additional years, totaling a maximum of 4 years. The blinds will be supplie

est.€280,000UNIVERSITY OF LIGE
Published 19 Nov 2025
AwardedResearch & InnovationBelgium

Supply and Installation of LIBS Systems

The Pickit project, developed by the GeMMe laboratory at the University of Liège, aims to integrate multiple sensors capable of extracting data from crushed waste fragments. This data is then analyzed by an artificial intelligence model, which classifies the fragments that are sorted by robotic arms

UNIVERSITY OF LIGE
Published 11 Sept 2025

Open in Construction

4 open listingsView all →