This contract involves the supply of outdoor high voltage switches (reclosers) along with a control cabinet that includes remote control equipment (DOS) with a control and monitoring unit. Additionally, it includes the supply of brackets for mounting the equipment or its components on poles. Detaile
Contract awarded. Originally published 9 months ago.
No single supplier dominates the field.
In engineering, EGD SRO has awarded 9 contracts to 7 suppliers.
+1 more supplier
Across engineering, the most active winners are DRIBO SPOL S RO, BRODOMERKUR ENERGETIKA d.o.o., BRODOMERKUR ENERGETIKA DOO — the field to beat, or your route in as a partner.
This public procurement contract involves the supply of profile meters and communication modules as outlined in Appendix 1 of the framework agreement. The precise details of the contract, including requirements, conditions, specifications, and other relevant information, are thoroughly detailed in t
This public procurement contract involves electrical installation work, specifically for construction, routine repairs, and troubleshooting of high voltage (HV), low voltage (LV), and distribution systems (DTS). The planned constructions are not covered by the sections for small-scale constructions
This public procurement contract involves electrical installation work, specifically for construction, routine repairs, and troubleshooting of high voltage (HV), low voltage (LV), and distribution systems (DTS). The planned construction projects are not covered by the categories of 'small-scale cons
This contract involves small-scale electrical installation work related to low-voltage equipment connected to outdoor wiring. The project is scheduled to take place from 2022 to 2024 and aims to increase capacity. Detailed specifications for this public procurement opportunity can be found in the te
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.