This contract opportunity involves the development of a Landscape Management Plan (LBP) for the B 38 / B 47 cycling and pedestrian path project between Krumbach and Reichelsheim. The work includes providing architectural, construction, and engineering services, as well as specific additional service
Tender closed on 20 Nov 2025. Awaiting award.
No single supplier dominates the field.
In engineering, HESSEN MOBIL ROAD AND TRAFFIC MANAGEMENT CENTRAL has awarded 3 contracts to 3 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract opportunity involves ecological construction supervision (öBB) and functional controls for the cycle path project between Cappel and Beltershausen. Suppliers are invited to provide services related to environmental oversight and quality assurance during the construction process. The pr
This contract opportunity involves the planning and design of replacement structures and temporary bridges for the construction project between Felsberg and Gensungen. The work includes preliminary and detailed planning phases (Phases 1 to 3) for the replacement of existing infrastructure, as well a
This contract involves the provision of surveying services for construction projects in the Biedenkopf and Eckelshausen areas. The selected supplier will be responsible for conducting precise measurements and assessments to support the construction process. The total value of the contract is approxi
This contract opportunity involves the disposal of tar and pitch-containing road excavation waste for the years 2026 and 2027. Suppliers are invited to provide services related to the safe and compliant disposal of this type of waste. The work is managed by Hessen Mobil, the authority responsible fo
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.