The Bad Kissingen wastewater treatment plant currently relies on a combined heat and power (CHP) system and a heating boiler, both of which can operate on biogas and natural gas. In the future, the CHP will only be used at night when there is no solar power available, and the use of natural gas will
Contract awarded. Originally published 8 months ago.
The City of Bad Kissingen is seeking suppliers to provide cleaning services, including regular maintenance cleaning, deep cleaning, and window cleaning for various municipal properties. This contract aims to ensure that all facilities are kept in a clean and hygienic condition, contributing to the o
The planned construction project involves the replacement and new construction of a four-stream primary school with a sports hall and all-day care. Extensive land leveling and filling are required on the site. The building is primarily designed as a single-story structure that adapts to the natural
The City of Bad Kissingen is seeking suppliers for the installation of a photovoltaic (PV) ground-mounted system with a capacity of 999 kWp near the Bad Kissingen wastewater treatment plant. This system aims to generate energy to meet the electricity needs of the treatment plant and will be integrat
The project involves redesigning the outdoor areas between existing building 2b (Interim Daycare Steinstraße) and Maxstraße. This includes creating a landscaped area with terraces, planting, fencing, and a new access path to the building (paving work). Key tasks include: 1. Site preparation: - Setti
Seeking experienced contractors to provide ongoing monitoring, maintenance, and repair services for hydroelectric power generation operations.
Opportunity to supply gas and electricity services to Places for People's property portfolio.
Construction project to build a new Energy Centre facility in Milton Keynes to support local energy infrastructure and supply needs.
NEUPC seeks suppliers to deliver sustainable energy solutions helping universities achieve carbon reduction and net zero commitments through a framework agreement lasting until 2027.