This contract involves two parts: Part 1 includes the design and installation of new UPS power supplies to replace existing ones, along with the delivery and installation of brand new UPS units, battery sets, battery racks, and battery disconnect switches, as well as monitoring of battery parameters
Contract awarded. Originally published 8 months ago.
This contract involves the preparation of project documentation and the construction of a new Air Traffic Management Center, along with the necessary supporting infrastructure. The project is in accordance with the obtained investment permit for a public airport located in Warsaw at 8 Wieżowa Street
This contract involves conducting flights to verify signal coverage for tracking purposes. The work will be carried out using aircraft equipped with ADS-B and FLARM transmitters, as well as RemoteID transmitters compliant with EN4709.002 standards. The flights will take place in specified areas desi
This contract opportunity involves performing scheduled maintenance inspections and repairs of technical security systems at facilities of the Polish Air Navigation Services Agency (PAŻP). The work is divided into three parts: Part 1 covers Szczecin, Part 2 covers Gdańsk, and Part 3 covers Łódź. Add
This contract involves the procurement and delivery of food products for the Polish Air Navigation Agency for the years 2026-2027. Suppliers are invited to provide various food items, including dried products, to meet the agency's needs. The deadline for submissions is December 12, 2025. For more de
Seeking experienced contractors to provide ongoing monitoring, maintenance, and repair services for hydroelectric power generation operations.
Opportunity to supply gas and electricity services to Places for People's property portfolio.
Construction project to build a new Energy Centre facility in Milton Keynes to support local energy infrastructure and supply needs.
NEUPC seeks suppliers to deliver sustainable energy solutions helping universities achieve carbon reduction and net zero commitments through a framework agreement lasting until 2027.