Bridge rehabilitation and renewal construction project for three Kerry bridges scheduled for 2026.
Contract awarded. Originally published 2 days ago.
Only 1 prior award here — too little to read.
In construction, Kerry County Council has awarded 1 contract to 1 supplier.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
Ireland is seeking civil engineering consultancy services to support Phase 2 of the Kenmare Relief Road infrastructure project.
Supplier sought to provide and maintain a lone worker protection system comprising smartphone applications and physical devices for a 36-month initial contract with optional 12-month extension.
Create and maintain a digital dashboard to monitor and visualize dark sky quality measurements across County Kerry with real-time data visualization and analysis tools.
Phase 2 upgrade of mooring infrastructure and systems at Knightstown Breakwater to enhance vessel operations and maritime safety.
Seeking contractor to replace communal flooring across corridors, landings and staircases at Carlton Grange three-block residential complex in Wrexham.
Structural roof repair project at Aberfan Community Centre sports hall requiring timber reinforcement, new bracing systems, and roof covering restoration.
Construction tender opportunity for the Barrack Accountant Building at Sarsfield Barracks, Limerick, requiring registered association and zipped file submissions.
Construction tender for the refurbishment of a locker facility and associated works at a Galway location, with submissions required through the e-tendering platform.