The contract involves providing services for establishing microforests using the Miyawaki method at two locations in Toruń. This includes planning and planting various native plant species in an irregular pattern within properly prepared soil. The project must comply with the Miyawaki method to crea
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In agriculture food, CITY OF TORU has awarded 3 contracts to 3 suppliers.
Across agriculture food, the most active winners are ID VERDE, H-REKULTIVACE, a.s., GLENDALE COUNTRYSIDE LIMITED — the field to beat, or your route in as a partner.
The contract involves the planting of 300 trees and their maintenance for three years in Toruń. Key tasks include: 1) Delivery and planting of trees according to specified locations, species, quantities, and parameters within 6 weeks of contract signing; 2) Care for all planted trees, including: a)
The contract involves providing maintenance and support services for the OTAGO System, which consists of various subsystems. A list of these subsystems can be found in Appendix 1 of the contract template. The subsystems and database operate on the Windows platform, using Oracle Database Standard Edi
The buyer, Gmina Miasta Toruń, is seeking suppliers for the delivery of two types of generators: a stationary generator with a capacity of 500 kVA/400 kW and a mobile generator with a capacity of 250 kVA/200 kW. The procurement is divided into two parts: Part 1 is for the stationary generator, and P
The Council invites licensed waste operators to provide glass collection, haulage, and reprocessing services for approximately 2,200 tonnes of annual kerbside glass recyclables under a 2-year concession contract starting November 2026.
Dover District Council is inviting bids for a three-year communal cleaning contract covering residential properties across the Dover district, with applications due by 14 September 2026.
Contract for annual collection, transportation, and environmentally compliant disposal or recycling of approximately 25,200 tonnes of water treatment residuals from NI Water facilities.
Consulting Engineer needed to manage the connection of a Group Water Scheme to the national Irish Water network, requiring expertise in water distribution civil engineering.