This contract opportunity involves providing road maintenance services for a period of 33 months in the Nysa region. The services include patrolling roads, responding to incidents such as accidents, collecting dead animals, and performing repairs and ongoing maintenance on national roads managed by
Tender closed on 22 Aug 2025. Awaiting award.
Only 2 prior awards here — too little to read.
In engineering, GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves the ongoing maintenance of national roads managed by the General Directorate for National Roads and Motorways (GDDKiA) in Wrocław from 2025 to 2028. The work is divided into several tasks: Task 1 – Maintenance of bituminous surfaces; Task 2 – Maintenance of sidewalks, pedestri
This contract involves the design and construction of the S12 expressway section from the Wieniawa junction (without junction) to the Radom Południe junction (with junction). Key tasks include: 1) Designing and constructing the expressway, including necessary engineering structures and safety device
This contract involves the preparation of project documentation for the construction of dedicated lighting and improving road safety at pedestrian crossings along National Road No. 72 in the Łódź Voivodeship. The work includes two main phases: Phase I focuses on the basic scope of project documentat
This contract involves the preparation of a Technical, Economic, and Environmental Study, along with materials needed for issuing an Environmental Conditions Decision for the project "Warsaw Agglomeration Bypass from S7 (without junction) to S8 (with junction)." The main objective of this assignment
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.