LITGRID AB is seeking engineering design services for the reconstruction of the 110 kV power line between Tauragė and Jurbarkas, including the branch line to Eržvilkas. This project involves detailed planning and design work to ensure the safe and efficient upgrade of the electrical infrastructure.
Contract awarded. Originally published 10 months ago.
This contract involves the reconstruction of the 330 kV single-circuit overhead power line from Jurbarkas to Bitėnai into a double-circuit line. The first phase of the work must be completed by January 7, 2022, and the second phase must be finished, with the project fully implemented, by April 1, 20
This contract involves the reconstruction of the 330 kV single-circuit overhead line from Klaipėda to Grobinė into a double-circuit line. The work is divided into two phases: Phase I must be completed by January 7, 2022, and Phase II, along with the overall project implementation, must be finished b
This contract involves the construction of a 330 kV overhead power line between Darbėnai and Bitėnai. The project is part of the infrastructure development in Lithuania and aims to enhance the electricity transmission network. Suppliers are invited to provide the necessary construction services, ens
This contract involves the replacement of synchronous data transmission network equipment at transformer substations. The work includes the installation of new telecommunications equipment to enhance data transmission capabilities. Suppliers are invited to provide their proposals for this project, w
Opportunity to establish and operate a collaborative Partner Testing Point facility in Iraq for quality assurance and product validation services.
Seek experienced integrated consultant team to manage design and delivery of new primary school and nursery unit in Derry/Londonderry using RIBA professional standards.
Provide independent design assurance and technical oversight for the UKHSA Health Security Campus programme, ensuring all designs meet safety, regulatory, and operational standards.
Replacement of UPS systems, busbar infrastructure, and electrical safety components to enhance operational resilience at the Colindale facility.