This contract involves the supervision of the renovation of the existing platform at Artern Train Station. The project includes the renewal of Platform 1 along the double-track electrified line 6300, covering a length of 175 meters. The construction supervision services are required from August 1, 2
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In engineering, DB INFRAGO AG BUSINESS UNIT PASSENGER STATIONS BUKR 11 has awarded 15 contracts to 15 suppliers.
+9 more suppliers
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves the installation of a protective scaffolding structure at the Dresden-Neustadt train station in Germany. The scaffolding is necessary to ensure the safety of passengers and to facilitate future maintenance work on the ceiling. The project includes the planning, manufacturing,
The German government is providing federal funds through the Climate Protection Package (KSP) for eligible measures related to reception buildings. Depending on the needs of each location, the project will focus on energy-efficient modernization, including structural improvements and enhancements to
This contract opportunity involves the installation of heating, ventilation, and air conditioning (HVAC) systems at the Darmstadt Central Station. The buyer, DB InfraGO AG, is seeking qualified suppliers to provide these essential services to enhance the comfort and efficiency of the station's envir
This procurement opportunity involves the construction services for a new pedestrian underpass (engineering structure), elevator shafts (engineering structure), and stair installations (engineering structure), along with associated works such as adjustments to the existing railway systems. Additiona
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.