This contract involves the delivery of a total of five (5) fully equipped control cabinets for the 110 kV substation at 'Dalgopol'. This procurement is part of the investment project C4.I4 'Digital Transformation of the Electricity Transmission Network', Subproject No. 1 'Implementation of an Automa
Contract awarded. Originally published 1 years ago.
Only 2 prior awards here — too little to read.
In engineering, NETWORK EXPLOITATION DISTRICT-VARNA has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are DRIBO SPOL S RO, BRODOMERKUR ENERGETIKA d.o.o., BRODOMERKUR ENERGETIKA DOO — the field to beat, or your route in as a partner.
This contract involves construction work, specifically the repair of the roof of the 20 kV switchgear at the Kavarna substation. The total value of the contract is €29,637.50. Suppliers are invited to submit their proposals for this project, which is part of the broader construction sector. For more
This contract involves providing subscription-based technical services for security systems at the Lazur facility. The services include inspection, diagnostics, preventive maintenance, servicing, functional testing, and documentation for various security systems such as video surveillance, alarm sys
The main objective of this contract is to carry out construction and installation works, which include repairing the foundations of the 110 kV power line "Izgrev" by removing old concrete, replacing the grounding of existing steel lattice towers, and disposing of construction waste.
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.