Brief
This project aims to enhance the infrastructure of public educational buildings to increase student engagement and create a healthy learning environment. The renovated buildings will have reduced energy consumption and lower greenhouse gas emissions. In Romania, the specific consumption of heating and hot water is double that of Western European buildings, leading to high pollution rates. Energy savings in public buildings can translate into significant reductions in conventional fuel use. Implementing energy efficiency measures in educational infrastructure will improve living conditions by: • Enhancing indoor comfort; • Reducing energy consumption; • Lowering maintenance costs for heating and hot water; • Decreasing pollutant emissions from energy production, transport, and consumption; • Optimizing the organization of educational activities by creating ideal conditions. Technical details of the construction: Land area – 18,729.00 sqm Existing built area – 4,893.00 sqm Existing usable area – 9,779.00 sqm C1 – Classrooms, laboratories, library, technical space (S+P+1) - Built area – 1,449.00 sqm / Usable area - 3,489.00 sqm; C2 – Classrooms, laboratories, technical space (P+2) - Built area – 1,493.00 sqm / Usable area – 3,774.00 sqm; C3 – Sports hall - Built area – 481.00 sqm / Usable area – 481.00 sqm; C4 – Dormitory and cafeteria (S+P+1) - Built area – 786.00 sqm / Usable area – 1,296.00 sqm; C5 – Technological laboratories (workshops) (P+1) - Built area – 524.00 sqm / Usable area – 579.00 sqm; C6 – School workshop (P) - Built area – 89.00 sqm / Usable area – 89.00 sqm; C7 – Gatehouse (P) - Built area – 25.00 sqm / Usable area – 25.00 sqm; C8 – Garage (P) - Built area – 46.00 sqm / Usable area – 46.00 sqm. Proposed area for demolition – 46 sqm (CORP C8) Proposed built area for new construction – 4,897.00 sqm Proposed usable area – 10,001.00 sqm Existing P.O.T. – 26.12% Proposed P.O.T. – 25.87% Existing C.U.T. - 0.52 Proposed C.U.T. – 0.53 At the end of the execution contract, all works must be completed according to the approved project documentation. Bidders can request clarifications up to 15 days before the deadline for submitting offers. Any clarification requests must be sent through SEAP (e-licitatie.ro). The contracting authority's response to clarification requests will be sent on the 11th day before the deadline for submitting offers.