Supply and Installation of Optical Partial Discharge Monitoring System
This contract involves the supply, installation, and commissioning of an optical partial discharge monitoring system for the gas-insulated 380kV switchgear at the Simmering substation. The project aims to enhance the monitoring capabilities of the electrical infrastructure, ensuring reliability and
Decision brief
4 fields- Contract value€1,033,113Euros
- Closing dateRollingNo closing date published
- SectorBrowse related listings
- LocationAustria
Suppliers
2 suppliers- VOGL ELECTRONIC GMBHLead contractor
- VOGL ELECTRONIC GMBHConsortium partner
Lifecycle
AwardedContract awarded. Originally published 1 years ago.
Brief
Track record
3 awards · 3 winnersNo single supplier dominates the field.
In construction, WIENER NETZE GMBH has awarded 3 contracts to 3 suppliers.
- VOGL ELECTRONIC GMBH1× · 33%
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, PDP MECHANICAL & ELECTRICAL LIMITED — the field to beat, or your route in as a partner.
More from WIENER NETZE GMBH
Construction of District Heating Pipeline in Vienna
This contract involves general contractor services for the construction, pipe laying, and insulation work required for the new installation of a district heating pipeline in the Gumpendorfer Straße area of Vienna (1060). The project is part of Phase 1 of the development in this region. Suppliers are
Planning Services for Hydrogen Pipeline Project
This contract involves the planning and design of a hydrogen pipeline between Simmering and Mannswörth in Austria. The buyer, WIENER NETZE GmbH, is seeking qualified suppliers to provide comprehensive planning services for this infrastructure project. The total value of the contract is €621,556. Int
Vehicle Body Repair Services Contract
This contract is for the provision of vehicle body repair services, specifically focusing on the repair of bodywork and accident damage. The awarded supplier, MODRIVE MERBAG GmbH, will be responsible for restoring vehicles to their original condition following damage. The contract is valued at appro
Open in Construction
Energy Efficiency Upgrades for Unit 1I at Scioból na bhFear, Gaoth Dobhair
Comprehensive energy efficiency and accessibility upgrade project for Unit 1I at Scioból na bhFear featuring new stairway, accessible facilities, and mechanical system improvements.
Heating and Ventilation Services for Spideal Language Commissioner Building - Unit 2
Heating and ventilation system replacement and ductwork modifications for a Gaeltacht regional authority office building in County Galway.
Waste Clearance Contract - Bolton House Road, Wigan
Urgent contract to remove 18,000 tonnes of illegally deposited waste from Bolton House Road, Bickershaw, with a compressed 15-day tender timeline due to public health and fire safety risks.
Divis Peatland Restoration Phase 2 - National Trust Northern Ireland
National Trust Northern Ireland seeks suppliers for Phase 2 of the Divis Peatland Restoration Project through the Proactis Plaza portal, with bids due 31st August 2026.